BC Energy Step Code Best Practices Guide Now Available - Industry Update

BC Energy Step Code

 

The Province has committed to taking incremental steps to increase energy-efficiency requirements in the BC Building Code to make buildings net-zero energy ready by 2032. The BC Energy Step Code--a part of the BC Building Code--supports that effort.

What is it? The BC Energy Step Code is a voluntary provincial standard enacted in April 2017 that provides an incremental and consistent approach to achieving more energy-efficient buildings that go beyond the requirements of the base BC Building Code. It does so by establishing a series of measurable, performance-based energy-efficiency requirements for construction that builders can choose to build to, and communities may voluntarily choose to adopt in bylaws and policies.

Why do we have it? In addition to supporting long-term improvements in energy efficiency in the BC Building Code, the BC Energy Step Code will improve the consistency of building regulations in the Province. The Energy Step Code is a single provincial standard that replaces the patchwork of different green building standards that have been required or encouraged by local governments in the past. This will allow local governments to continue to play a leadership role in improving energy efficiency, while providing a single standard for industry and build capacity over time.

How does it work? The BC Energy Step Code takes a new, performance-based approach rather than the traditional prescriptive approach. The BC Energy Step Code does not specify how to construct a building, but identifies an energy-efficiency target that must be met and lets the designer/builder decide how to meet it.

To comply with the BC Energy Step Code, builders must use energy modelling software and on-site testing to demonstrate that both their design and the constructed building meet the requirements of the BC Energy Step Code. The new standard empowers builders to pursue innovative, creative, cost-effective solutions, and allows them to incorporate leading-edge technologies as they come available.

The BC Energy Step Code also supports consumer choice, by allowing designers and builders to use natural gas, electricity, or other energy sources for their project without imposing a penalty on this decision. This fuel-neutral approach provides builders with the flexibility to make energy-efficient buildings using all available technologies.

Is it required? The BC Energy Step Code is currently a voluntary standard builders across B.C. can use. In addition, local governments can choose to require or encourage builders to meet one or more steps of the BC Energy Step Code as an alternative to the BC Building Code’s prescriptive requirements.

When does it take effect? The BC Energy Step Code came into force in April 2017 so builders have the option of building to the requirements in the Energy Step Code at any time. Local governments can set bylaw requirements for builders to meet one or more steps effective December 15, 2017 (when local governments’ authority to set technical building requirements by bylaw will change under the Building Act).

Questions about the BC Energy Step Code can be directed to the Building and Safety Standards Branch at Building.Safety@gov.bc.ca

BC Energy Step Code: A Best Practices Guide for Local Governments

2017 Metrics Research - Summary Report

2017 Metrics Research - Full Report

NRCA Homepage.png

NRCA's New Website Launches

We are happy to announce that our new website is live! We are excited for our members to take advantage of all the new features available to them.
Read More
construction-file-default(0).jpg

The Construction Management Project Delivery Method

CCA has introduced the new CCA 26 A Guide to the Construction Management (CM) Project Delivery Method (2016). Along with the Guide these are some other considerations which are very important in insuring a successful delivery of a project using Construction Management.
Read More
construction-file-default(0).jpg

Proactive Release of Project Information for the Construction Industry

Over the last decade new people, processes and procurement protocols have led to a loss in some fundamental practices in regard to accessing information that is paramount to fair, open and transparent bidding. This has been a significant challenge for the construction industry, and recently the BC Government has taken an important step in restoring standards for accessing information through the release of “Guidance for the Release of Information &/or Documents Related to Competitive Procurement Opportunities”.
Read More
bcca-cca2.png

CCA Quality of Documents Report Issued

In 2015, the Canadian Construction Association (CCA) embarked on a series of “Quality of Documents” workshops across Canada. In BC workshops were sponsored by NRCA in Prince George and VRCA in Vancouver with participants invited from across the Province. It was an opportunity to discuss the issue of poor quality documentation in the Canadian building industry.
Read More
report-procuring-innovation-260x336(0).png

New Construction Industry Report Shows Procurement Drives Innovation

VICTORIA, BC – The British Columbia Construction Association (BCCA) has published a follow-up to its Innovation Report (February 2016), which revealed BC’s construction sector lags behind other jurisdictions when it comes to innovation. The new report is called “Procuring Innovation” and lays out the case for the sector to recognize the procurement process as the key for driving innovative projects and sector development.
Read More