Proactive Release of Project Information for the Construction Industry

November 30, 2016

Over the last decade new people, processes and procurement protocols have led to a loss in some fundamental practices in regard  to accessing information that is paramount to fair, open and transparent bidding. This has been a significant challenge for the construction industry, and recently the BC Government has taken an important step in restoring standards for accessing information through the release of “Guidance for the Release of Information &/or Documents Related to Competitive Procurement Opportunities”.   

This document states that ‘Wherever possible, information should be pro-actively released in order to increase capable vendors’ interest in government opportunities, to ensure consistent information is supplied to all potential vendors , and to streamline access to information that would be released under the Freedom of Information and Protection of Privacy Act (FOIPPA)’. It is important to note that although this document establishes the requirements for accessing information from the BC Government, its Agencies and Crown Corporations; it is also a signal to the rest of the public sector as to what information is to be made publicly available.

This CAMF Best Practices Guideline addresses ‘Routinely Released’ information and/or documents. The Routinely Released requirement gives recognition to accessing information for ‘construction’ with a ‘Depends’ consideration that recognizes the long established practices of providing the information and documents.  The Guidelines provide the required access to the construction industry for (including but not limited to):

  • Solicitation documents and documents referenced therein.
  • Budget information for proposed projects.
  • Evaluation criteria (Applicable to an RFQ).
  • Names of contractors (bidders lists or invited participants) participating in a procurement solicitation before closing.
  • Lists of successful respondents to an RFQ.
  • Names of bidders and bid amounts after closing procurement solicitation (including Trade Contractors in Construction Management where the CM is an agent of the Owner).
  • Lists of subcontractors submitted with a contractor’s response.
  • A respondents own evaluation information in response to an RFQ.

BCCA has issued several Construction Files   that highlight the importance to the industry in accessing this information:

Ensuring that a bidding process is fair, open and transparent is perhaps the second most important element in the bidding process to contractors -- preceded only by whether they were the successful bidder on the project. Fair and open bidding is about promoting a transparent bidding process that eliminates favoritism or improper influence, while being diligent with the taxpayer’s money. Providing information to the construction industry in a transparent.

BC_Close-Out_Procedures_Cover(0).jpg
March 05, 2018

BC Close Out Procedures

The purpose of this Document is to recommend standard procedures to facilitate the closing stages of a construction contract and the close out of the project.
Read More
BCCA-Best-of-Logo-final(0).png
December 14, 2017

The Unsung Heroes of Public Sector Construction

The BC Construction Association, the province’s provincial advocate for the industrial, commercial, and industrial construction sector, recognized seven public projects and owners for excellence in construction procurement in 2017.
Read More
report-procuring-innovation-260x336(0).png
May 17, 2017

New Construction Industry Report Shows Procurement Drives Innovation

VICTORIA, BC – The British Columbia Construction Association (BCCA) has published a follow-up to its Innovation Report (February 2016), which revealed BC’s construction sector lags behind other jurisdictions when it comes to innovation. The new report is called “Procuring Innovation” and lays out the case for the sector to recognize the procurement process as the key for driving innovative projects and sector development.
Read More
1483705972_06jan17-certainteed.jpg
January 06, 2017

Tribunal Rules on US Gypsum Board Imports

An inquiry has made a series of recommendations about import duties after hearing about the injury caused to Canada’s industry by the pricing regime for gypsum board brought in from the USA.
Read More
NRCA Homepage.png
December 14, 2016

NRCA's New Website Launches

We are happy to announce that our new website is live! We are excited for our members to take advantage of all the new features available to them.
Read More
construction-file-default(0).jpg
November 30, 2016

Proactive Release of Project Information for the Construction Industry

Over the last decade new people, processes and procurement protocols have led to a loss in some fundamental practices in regard to accessing information that is paramount to fair, open and transparent bidding. This has been a significant challenge for the construction industry, and recently the BC Government has taken an important step in restoring standards for accessing information through the release of “Guidance for the Release of Information &/or Documents Related to Competitive Procurement Opportunities”.
Read More
construction-file-default(0).jpg
October 26, 2016

The Construction Management Project Delivery Method

CCA has introduced the new CCA 26 A Guide to the Construction Management (CM) Project Delivery Method (2016). Along with the Guide these are some other considerations which are very important in insuring a successful delivery of a project using Construction Management.
Read More